Stringing Work Twin Bundle ACSR SUTT 150 KV. Location: Rambangdangku – Banjarsari - Lahat, Palembang
Stringing Work SUTT 150 kV Twin Bundle Conductor TACSR 520 mm2. Location: Tanjung Jati - Sayung, Central Java
Reconductoring Work ACCC Lisbon SUTT 150 kV Penghantar #1. Location: Gilimanuk – Celukan Bawang, Bali
Reconductoring Work ACCC Lisbon SUTT 150 kV. Location: Kapal – Padang Sambian, Bali
Material Procurement, Cable Pullout and Installation Cable TR PLTS 30 kW. Location: Maybrat, Papua
Transmission Reposition Work 500 kV. Location: Bandung – Mandirancan 2, West Java
Transmission Work 150 kV (2xZebra 429/55 mm2) dan OPGW. Location: Sagulung – Tanjung Uncang, Batam
Up Rating Work SUTT 150 KV TACSR 520 mm2 dan Fiber Optic. Location: Cilegon Baru – Cilegon Lama, Banten
Reconductoring Work, Hawk Conductor to ACCC Amsterdam 360 mm. Location: Duri – Garuda Sakti, Pekanbaru
Stringing Work SUTT 150 KV Double Circuit (1x240/40 mm2). Location: Singkawang - Bengkayang, West Kalimantan
Reconductoring Work, Hawk Conductor to ACCC Lisbon 310 mm. Location: Bukit Asam - Baturaja, Palembang
Reconductoring Work, ACSR SUTT 150 kV to ACCC Lisbon. Location: GI Batu Besar – GI Baloi – GI Harapan, Batam
Reconductoring Work, ACSR SUTT 70 kV to ACCC Helsinki. Location: GI Borang – GI Seduduk Putih, Palembang
Reposition and Reinstall SUTT 150 KV PLTU Celukan Bawang Incomer. Location: Celukan Bawang, Bali
Conductor Redeployment and Tower Dismantling Tower SUTT 70 kV. Location: GI Pelabuhan Ratu - GI Bayah, Sukabumi
Stringing Work SUTT 150 kVACSR 1x240 mm2. Location: GI Pelabuhan Ratu - GI Bayah, Sukabumi
Stringing Work SUTT 150 kV. Location: GI Maligi - GI Indoliberty, Karawang
Tower Installation Emergency Work T. 185 SUTET 500 kV. Location: GI Bandung Selatan - GI Mandirancan #2, Sumedang
Sealing End Replacement Work T. 9 SUTT 150 kV (Manggala Wana Bakti) PT PLN (Persero) P3B JBAPP Pulo Gadung. Location: GI Karet - GI CSW, Jakart
Sealing End Replacement Work T. 15 SUTT 150 kV PT PLN (Persero) P3B JBAPP Pulo Gadung. Location: GI Karet - GI CSW, Jakarta
Stringing Work SUTT 150 kv ACSR. Location: GI Bungus - GI Kambang, Padang
Stringing Work SUTT 150 kV ACSR. Location: GI Keban Agung - GI Lahat, Palembang
Stringing Work SUTT 150 kV ACSR - Cikarang Listrindo. Location: Jababeka, Babelan
Stringing Work SUTT 70 kV ACSR. Location: Holtekamp, Jayapura
Stringing Work SUTT 150 kV ACSR - Pertamina Geothermal. Location: PLTP Karaha - GI Garut, Cilawu
Stringing Work SUTT 70 kV ACSR. Location: Waena, Jayapura
Reconductoring Work SUTT 150 kV ACCC Hamburg. Location: GI Serpong - GI Lengkong, Banten
Stringing Work SUTET 275 kV ACSR. Location: Kiliranjao - Payakumbuh, Padang
Stringing Work SUTET 275 kV ACCC DUBLIN. Location: Pengerang Cogen Plant – Peninsular, Malaysia
Dismantling Work Conductor and Accessories SUTT 150 kV. Location: Blimbing – Sukorejo, East Java
Reconductoring Work SUTT 150 kV HVCRC Hawk. Location: GI Serpong - GI Bintaro - GIPetukangan, Jakarta-Banten
Reconductoring Work SUTT 150 kV HCLS > 1200A. Location: Kenjeran - Ujung, Jawa Timur
Recovery Work SUTT 150 kV ACCC Hamburg. Location: Cilegon Baru - Serang, Banten
Exaltation Work SUTT 70 kV. Location: Sekarputih - Siman - Mendalan, East Java
Reconductoring Work on 150 kV SUTT for the Construction of SKTT UGC 150 kV Kalisari - TX (Sukolilo - Kenjeran) and 150 kV SUTT Sukolilo - TX (UGC Kalisari). Location: Sukolilo - Kenjeran, East Java.
Replacement Work GSW SUTT 150 kV APP Malang. Location: Ngoro - Sekarputih - Siman/Mendalan - Sengkaling, Kertosono - Ploso, East Java
Dismantling Work Konduktor SUTT 70 kV Penghantar Bungaran – Sungai Kedukan. Location: Bungaran - Sungai Kedukan, Palembang – South Sumatera
Stringing Work SUTT 150 kV ACSR. Location: Gumawang - Mesuji, Lampung
Stringing Work SUTT 150 kV 2xACSR. Location: Menggala - Seputih Banyak, Lampung
Stringing Work SUTT 150 kV HTLS > 1200A. Location: Pedan - Wonosari, Central Java
Replacement Work GSW SUTT 150 kV. Location: APP Malang, East Java
Replacement Work GSW SUTT 150 kV. Location: APP Surabaya, East Java
Tower Exaltation Work 70 kV dan 150 kV. Location: UPT Palembang, South Sumatera
Replacement Work Conductor 70 kV SUTT. Location: Ujungberung - Sumedang 1-2 dari Tower 14 - 19,West Java
Improvement Work SUTT Muarakarang Baru - Durikosambi (T.31-T.37). Location: Muarakarang Baru - Durikosambi Tower 31 - 37, Jakarta
Replacement Work Tower Pole SUTT 70 kV. Lokasi: Sekarputih - Tjiwikimia, Jawa Timur
Replacement Work of AS 70 MM2 Stringset and Installation of AS 70 MM2 along with its Stringset on Tension and Suspension Towers to Replace Corrosive Lightning Wires on SUTT Wate - Purworejo T. 1-56, SUTT 150 kV Bantul - Wates T.1-41, SUTT 150 kV Bantul - Purworejo T.1-75. Location: UPT Salatiga, Central Java.
Tower Exaltation Work Extention UPT Palembang Lokasi : UPT Palembang, Sumatera Selatan
Improvement Work IGWS UPT Palembang. Lokasi : UPT Palembang, Sumatera Selatan
Replacement Work Isolator UPT Malang. Lokasi : Jawa Timur
Replacement Work String Set Isolator and Isolator String Set Tower Tension dan Suspension SUTT 150 KV BawenSecang-Sanggrahan T.54-T.55, SUTT 150 KV Temanggung-Secang T.131A, T.90-100, SUTT 150 KV Bantul-Purworejo (Ruas Wates-Purworejo) T.13, T.26, SUTT 150 KV Bantul-Purworejo (Ruas Bantul-Wates) T.67-T.81, SUTT 150 KV Palur-Masaran T.01-21. Lokasi: UPT Salatiga, Jawa Tengah
Improvement Work from Single Phi to Double Phi for Non-Standard GI - Replacement of Tower 79 Type AA to Type FF (Dead End) SUTT 150 KV Merica - Rawalo to Support the Double Phi GI Work in Purbalingga. Location: Merica - Rawalo, Central Java.
Engineering, Procurement and Construction, 150 kV Overhead Transmission Line, Sulut 3 Power Plant – PLN's S/S Minahasa North Sulawesi. Lokasi : Minahasa, Sulawesi Utara
Exaltation Work Tower 150 kV Ground Clearance SUTT PLN APP Cawang. Location: APP Cawang, Jakarta
Tower Strengthening Work and Saging SUTT 150 kV. Location: Bogor Baru – Sentul – Cibinong, West Java
Relocation Work & Handling of Critical Tower SUTET 500 kV T/L Tower 149. Location: Saguling - Cibinong, West Java.
Critical Tower Relocation Work T.47 SUTT 150 kV. Location: Pudakpayung – Ungaran, Central Java
Construction Work for the Critical Tower Emergency T.10 SUTT 150 kV Jatiluhur - Tatajabar. Location: Jatiluhur – Tatajabar, West Java.
Handling of Collapsed Tower T.09 SUTT 150 kV. Location: Lamongan - Paciran, East Java
Replacement work for the conductor and line dropper clamps at the Kembangan Bay and Durikosambi Bay in GITET Gandul. Location: Gandul, Cinere Depok, West Java.
Stringing Work T/L 150 kV Marisa – Moutong Section 1. Location: Gorontalo, North Sulawesi
Repair Work for Tension Clamp Gantry SUTT #1. Location: Bintaro - Serpong South Tangerang, Banten
Replacement of GSW SUTT 150 kV Petukangan - Bintaro - Serpong and SUTT 150 kV Petukangan - Cirendeu - Gandul in the context of replacing GSW Distributed on the Transmission Lines of the Cawang UPT Region. Location: Petukangan - Cirendeu - Gandul, South Tangerang - Banten.
Recovery of SUTT 150 KV Muara Karang Baru - Pik Circuit 1 and 2. Location: Muara Karang, North Jakarta - DKI Jakarta
Replacement of Critical Condition GSW and Repair of Lightning Protection System in the East Java and Bali Transmission Unit (Procurement and Installation of Critical Condition GSW and Installation of Double Jumper GSW in the Malang UPT Area). Location: Malang, East Java.
Replacement Work 150 kV SUTT Conductor Suralaya-Mitsubishi-Cilegon using ACCC Hamburg and Dublin Conductors. Location: Suralaya, Cilegon - Banten.
Reconfiguration Work of LLG Krian (150 kV SUTT Krian – Driyorejo / Babadan with 150 kV Ex Krian – Sawahan). Location: Krian, Sidoarjo - East Java
275 kV Transmission Lines CFS PP Sumsel-1 To Substation Betung. Location: Sumatera Selatan
Procurement of AS 70 mm2 Earth Wire String Set and services for replacement of Earth Wire SUTT 150 kV STARA-PLTU T.50-67,67A,67B,68A,69A. Location: Rawalo Banyumas, Purwokerto - Central Java.
Relocation & Handling Work of Critical SUTET 500 kV Towers Tower 12, Tower 24 & Tower 41. Location: Cirata – Cibatu, West Java
Improving The Reliability Of Transmission Lines In The UIT JBB Area, Scope Of The Lightning Protection System in UPT Cawang
Improving The Reliability Of Transmission Channels In The UIT JBB Area, Including Tower Elevation At UPT Cawang
Replacement Span Conductor Services T.95C - T.097 SUTET 500 kV Deltamas-Cibatu #1 And #2
Construction Of A 20 kV Tower Crossing Across The ULP Marabahan River, PT PLN (Persero) UP3 Banjarmasin
Replacement Of Critical GSW At UIT JBB Scope Of Replacement Critical GSW At UPT Cikupa
Improving the Reliability of Transmission Lines at UIT JBB Scope of Reinforcement of Busbar Beams at CSW Bay and Senayan PLTD Bay at GI Karet Lama